Construction on Northumberland County’s first GC Services for New-Build Elementary School in CobourgStatusAwardValue$18.9MLocation849 New Amherst Blvd, Cobourg ONSectorPublic – State/ProvincialTypeEducational · New ConstructionData as of November 17, 2026 is progressing on schedule and is set to open its doors to students in September 2027.
The $27.5 million school, including land, design and Âé¶¹´«Ã½Ó³» costs, was commissioned by Conseil scolaire catholique MonAvenir and is slated to accommodate 259 students from junior kindergarten to Grade 6.
The 30,000-square-foot building, designed by Kingsland Architects, will also incorporate a fully integrated French-language day care with 49 licensed spots for infants to preschoolers and a large playground.
The general contractor is Pre-Eng Contracting Ltd.
The school is on a four-acre site at 737 New Amherst Blvd. in Cobourg in the New Urbanism community of New Amherst.
Geneviève Grenier, president of Conseil scolaire catholique MonAvenir, said at the school’s groundbreaking in September that it will be “a long-awaited and essential anchor for the Francophone and Catholic community of Cobourg and its surrounding areas.�
Joint capital funding and support from the Ontario Ministry of Education and the Government of Âé¶¹´«Ã½Ó³» helped make the school a reality, she said.

The school will offer 100 per cent French-language immersion with the exception of English classes. The school will facilitate local students attaining a high level of bilingualism, which will be beneficial to their future post-secondary education and careers.
“This new school facility will make it easier for local families to access French language Catholic education. These families have been waiting for a school close to home so they can avail themselves of the right to study in French as a first language,� said Marcellin Kwilu Mondo, vice president school board and school trustee for the Durham Chair of Conseil scolaire catholique MonAvenir Peterborough Northumberland region, at the school ground-breaking in September.
Presently, students have had to travel outside of Northumberland County to Peterborough or Oshawa to attend a French-language school or attend French immersion programs offered by Northumberland County’s English-language board, which aren’t designed for students already strong in the French language.
The catchment area for the new French-language school will be determined following consultations in December.
According to Statistics Âé¶¹´«Ã½Ó³» census data, Northumberland County has a total Francophone population of 1,565 people (representing about 1.8 per cent of the county’s total population). However, 5,475 people are bilingual in English and French (about 6.2 per cent of the population).
French was listed as the primary official language for 9,145 people.
The French school board’s director of planning and real estate, Youness Dafif, says the school’s site in Cobourg was selected eight years ago and is as part of the school board’s expansion east of Toronto to serve the growing French-language community.
The Cobourg build is the board’s 64th school.
As part of this eastern expansion, Âé¶¹´«Ã½Ó³» of a French-language elementary school in Brooklin in north Whitby will start in March 2027.
A site plan approval process will begin in early 2027 for a secondary school planned for Bowmanville.
The Brooklin school will accommodate 354 students and have 50 child care spaces in a 43,000-square-foot, U-shaped building, designed by Bortolotto, at Ashburn Road and Vipond Road. It’s slated to open in September 2028.
Dafif says the Cobourg school is about 25 per cent completed with Âé¶¹´«Ã½Ó³» expected to wrap up in July 2027. The building was not targeting LEED standards, but will have the most up-to-date, energy efficient heating and cooling system, be fully accessible as well as have larger than typical classrooms and gym.
Recent Comments
comments for this post are closed