Âé¶¹´«Ã½Ó³»­

Skip to Content
View site list

Profile

Pre-Bid Projects

Pre-Bid Projects

Click here to see Âé¶¹´«Ã½Ó³»­'s most comprehensive listing of projects in conceptual and planning stages

Projects

Tallest skyscraper in Vaughan unveiled as final phase of Expo City

DCN-JOC News Services
Tallest skyscraper in Vaughan unveiled as final phase of Expo City
DOUBLESPACE/YOUNES BOUNHAR — Designed by BDP Quadrangle for Cortel Group, the 604,000 square foot, 60-storey CG Tower has become Vaughan, Ont.’s tallest skyscraper.

VAUGHAN, ONT. — CG Tower, the fifth and final phase of the Expo City masterplan in Vaughan, Ont., has officially been unveiled.

Designed by BDP Quadrangle for Cortel Group, the 604,000 square foot, 60-storey residential tower has become the city’s tallest skyscraper.

According to a release, the tower deliberately departs from the glass-clad esthetic of the surrounding residential buildings, featuring a red brick façade and structure that is comprised of a series of sequenced cantilevered boxes supported by Vierendeel trusses. The project features terraces offering panoramic views of Cortellucci Square (formerly Edgeley Pond Park) and the VMC along with a transparent four-storey podium.

 

The tower deliberately departs from the glass-clad esthetic of the surrounding residential buildings, featuring a red brick façade and structure that is comprised of a series of sequenced cantilevered boxes supported by Vierendeel trusses.
DOUBLESPACE/YOUNES BOUNHAR — The tower deliberately departs from the glass-clad esthetic of the surrounding residential buildings, featuring a red brick façade and structure that is comprised of a series of sequenced cantilevered boxes supported by Vierendeel trusses.

 

Amenity spaces are located throughout the tower on levels 4, 20, and 32 and include a fitness studio, yoga space, children’s play area, outdoor pool, dining and entertainment lounge and a co-working and social space with views of the city.

CG Tower also utilized brick-embedded precast panels with factory-installed windows.

“This use of off-site fabrication greatly accelerated installation timelines, with an entire building floor able to be installed in a single day,â€� the release notes. “At the same time, it strengthened worker safety while enhancing the tower’s building envelope performance through tighter Âé¶¹´«Ã½Ó³»­ tolerances, more consistent installation quality, and reduced potential for air leakage and water infiltration.â€�

This approach also helped address several Âé¶¹´«Ã½Ó³»­ challenges, including limited laydown space, hoist congestion and the need for reliable weather protection during envelope installation. A mid-tower mechanical penthouse further allowed the building to be occupied in phases, optimizing energy use and Âé¶¹´«Ã½Ó³»­ sequencing while reducing emissions.

Print

Recent Comments

comments for this post are closed

You might also like