TORONTO — VIA Rail Âé¶¹´«Ã½Ó³» (VIA Rail) completed the modernization of its Design/Build – VIA Rail – Toronto Maintenance Centre (TMC) ModernizationStatusUnder ConstructionValue$20MLocation1611 Islington Ave, Toronto ONSectorPublic – FederalTypeTransportation Terminals · Demolition · RenovationData as of November 3, 2026, which will support its new Corridor fleet of 32 bidirectional trainsets, while continuing to service existing equipment.
Funded by a $310 million investment from the Government of Âé¶¹´«Ã½Ó³», the project was undertaken in four years.
It supported up to 475 jobs in skilled trades and Âé¶¹´«Ã½Ó³» and more than 80 per cent of the project’s content was Canadian, states a release.
The upgraded Toronto Maintenance Centre features expanded maintenance bays and inspection platforms, preventive and corrective maintenance tracks compatible with trainsets of up to 10 cars, under-track pits and roof- and car-level work platforms allow maintenance teams to work around the train in a single integrated location.Â
The facility also includes specialized heavy-maintenance equipment, including a stand-alone wheel lathe and a bogie drop table, as well as upgraded yard tracks designed to improve train movements and reduce operational bottlenecks.
Fuel-plant improvements were also included and add new sanding, windshield-washer-fluid and diesel-exhaust-fluid systems.Â
A new Vehicle Equipment Measurement System was also added which allows for real-time diagnostics.
The completed facility is part of VIA Rail’s broader transformation, alongside the new Corridor fleet, the renewal of its long-distance, regional and remote fleet, and projects such as the Dorval Multimodal Hub, the release adds.
Recent Comments
comments for this post are closed