Graph 2 at the end of this article shows that the gap between high year-over-year material cost increases, as captured in two Producer Price Index (PPI) series, and relatively restrained year-over-year bid price increases from contractors (also coming from a PPI) is narrowing, but it remains immense.

The respective percentage-change figures in August, the latest month for which data is available, were +21% and +31% for materials, according to two alternative PPI measures, but +5% for bid prices.
Interestingly, +5% isn’t low. It’s a match for the currently concerning rate of general price inflation as reflected in the all-items Consumer Price Index (CPI). But +5% appears mild next to +31% or +21%.
The journey to Graph 2 through this article showcases the latest inordinately large increases in material costs (Graph 1) and the history of price changes for 28 Âé¶¹´«Ã½Ó³» inputs (Cluster Charts 1 to 7). Also, Table 1 includes pricing results for some additional Âé¶¹´«Ã½Ó³» components, plus PPI compilations of materials going into certain types-of-structure.
In late Spring, early Summer, huge hikes in the price of softwood lumber caught everyone’s attention. But that ‘madness’ has now passed. More sawmill capacity has been brought onstream, imports have been upped somewhat, the flurry of home renovation activity has eased with the onset of Fall and housing starts, after rising sharply, have leveled out.
In Graph 1, softwood lumber prices are shown to have dropped by half (-49.5%) over the latest three months. As a result, media headlines have moved on to different subject matter. But that’s surface coverage. There are plenty of other Âé¶¹´«Ã½Ó³» materials and components (including forestry products separate from softwood lumber) that are continuing to exhibit pricing strength.
The curves with recent ‘mountain peaks’ among the cluster charts include plywood, particle board, steel items, aluminum mill shapes, copper wire and cable, asphalt and gasoline.
There are also big year-over-year price increases for gypsum (+22.9%), insulation materials (+17.2%), heating equipment (+13.2%) and paints and coatings (+10.4%). Not too alarming, but still attention-worthy, are the y/y price increases for air conditioning equipment (+8.5%) and flat glass (+7.1%). ÌýÌý
From Producer Price Index (PPI) Series – August 2021

Charts: ConstructConnect.

Charts: ConstructConnect.

Charts: ConstructConnect.

Charts: ConstructConnect.

Charts: ConstructConnect.

Charts: ConstructConnect.

Charts: ConstructConnect.

Charts: ConstructConnect.
% Change in the August 2021 Index from:
| 3 Years | 1 YearÌý | 6 months | 3 months | 1 monthÌý | |||||
| Ago | Ago | Ago | Ago | Ago | |||||
| Final Demand/Service/Commodity/Energy/Input: | Ìý | Ìý | |||||||
| Final Demand Construction | 12.9% | 5.0% | 4.7% | 2.4% | 0.2% | ||||
| ÌýÌý New warehouse building Âé¶¹´«Ã½Ó³» | 13.6% | 7.1% | 6.9% | 3.5% | 0.2% | ||||
| ÌýÌý New school building Âé¶¹´«Ã½Ó³» | 13.1% | 3.4% | 3.7% | 2.6% | 0.1% | ||||
| ÌýÌý New office building Âé¶¹´«Ã½Ó³» | 13.2% | 6.0% | 4.8% | 1.5% | -0.3% | ||||
| ÌýÌý New industrial building Âé¶¹´«Ã½Ó³» | 15.5% | 5.0% | 4.9% | 4.0% | 1.1% | ||||
| ÌýÌý New health care building Âé¶¹´«Ã½Ó³» | 11.7% | 4.4% | 4.7% | 1.4% | 0.6% | ||||
| Architectural & engineering services | 4.9% | 3.3% | 0.7% | 0.2% | 0.0% | ||||
| Construction machinery & equipment | 9.3% | 5.4% | 3.4% | 2.5% | 0.8% | ||||
| Asphalt | -4.0% | 50.9% | 26.1% | 19.4% | 1.1% | ||||
| Plastic Âé¶¹´«Ã½Ó³» products | 32.6% | 29.6% | 22.2% | 11.0% | 3.0% | ||||
| Softwood lumber | 18.6% | -9.8% | -30.8% | -49.5% | -27.3% | ||||
| Hardwood lumber | 28.2% | 44.3% | 21.2% | 5.9% | -0.3% | ||||
| Millwork | 23.1% | 16.8% | 9.8% | 0.8% | -2.3% | ||||
| Plywood | 78.0% | 61.3% | 38.2% | 4.5% | -11.5% | ||||
| Particle board & oriented strandboard (OSB) | 137.4% | 71.1% | 33.6% | 8.8% | -8.9% | ||||
| Gypsum | 12.4% | 22.9% | 14.2% | 6.5% | 0.5% | ||||
| Insulation materials | 15.1% | 17.2% | 10.5% | 6.7% | 4.4% | ||||
| Construction sand, gravel & crushed stone | 13.5% | 3.9% | 1.9% | 0.3% | -0.1% | ||||
| Cement | 8.0% | 3.9% | 3.1% | 2.3% | 0.6% | ||||
| Ready-mix concrete | 10.0% | 5.1% | 3.5% | 2.5% | 1.6% | ||||
| Precast concrete products | 17.3% | 9.5% | 5.9% | 1.9% | 0.5% | ||||
| Prestressed concrete products | 11.3% | 9.5% | 8.7% | 5.5% | -1.1% | ||||
| Brick (clay) | 9.2% | 4.5% | 2.9% | 0.6% | 0.2% | ||||
| Coal | -3.1% | 2.7% | 3.1% | 0.1% | -0.5% | ||||
| Iron ore | 29.6% | 23.9% | 19.6% | 18.8% | 0.2% | ||||
| Iron & steel scrap | 37.1% | 87.1% | 16.1% | 6.6% | -3.7% | ||||
| Steel bars, plates & structural shapes | 26.1% | 49.0% | 26.8% | 12.4% | 2.4% | ||||
| Steel pipe & tube | 42.6% | 63.5% | 42.8% | 23.8% | 9.2% | ||||
| Fabricated structural metal products | 32.9% | 32.4% | 25.0% | 12.1% | 3.2% | ||||
| Prefabricated Metal Buildings | 44.0% | 50.8% | 28.8% | 18.7% | 3.3% | ||||
| Aluminum mill shapes | 15.2% | 35.1% | 20.9% | 7.9% | 3.7% | ||||
| Flat glass | 9.3% | 7.1% | 4.6% | 2.8% | -0.3% | ||||
| Paints, architectural coatings | 22.0% | 10.4% | 7.2% | 5.8% | 0.5% | ||||
| Lighting fixtures | 13.4% | 5.9% | 5.1% | 2.3% | 1.0% | ||||
| Plumbing fixtures & fittings | 10.9% | 4.3% | 2.1% | 1.5% | 0.8% | ||||
| Elevators & escalators | 9.7% | 3.9% | 2.8% | 1.2% | 0.2% | ||||
| Heating equipment | 19.5% | 13.3% | 11.0% | 6.6% | 2.8% | ||||
| Air conditioning equipment | 14.3% | 8.5% | 5.4% | 2.7% | 0.1% | ||||
| Copper wire & cable | 26.7% | 31.4% | 15.8% | 2.2% | 1.9% | ||||
| Regular gasoline unleaded | 7.5% | 77.5% | 36.6% | 5.6% | -2.8% | ||||
| Diesel Fuel | 25.6% | 67.2% | 20.8% | -1.4% | -2.0% | ||||
| Inputs to new Âé¶¹´«Ã½Ó³» | 24.5% | 21.0% | 12.0% | 3.2% | -1.4% | ||||
| Inputs to new residential Âé¶¹´«Ã½Ó³» | 25.1% | 19.9% | 10.8% | 2.0% | -3.2% | ||||
| Inputs to new non-res Âé¶¹´«Ã½Ó³» | 23.1% | 21.4% | 12.4% | 4.0% | -0.1% | ||||
| ÌýÌý Inputs to commercial Âé¶¹´«Ã½Ó³» | 23.0% | 21.4% | 12.9% | 4.7% | 0.4% | ||||
| ÌýÌý Inputs to healthcare structures | 23.1% | 20.3% | 11.9% | 3.9% | -0.1% | ||||
| ÌýÌý Inputs to industrial structures | 24.1% | 20.2% | 12.1% | 5.3% | 0.8% | ||||
| ÌýÌý Inputs to highways & streets | 19.3% | 20.8% | 12.7% | 4.6% | 0.6% | ||||
| ÌýÌý Inputs to power & communication structures | 22.0% | 22.1% | 13.0% | 3.9% | -0.2% | ||||
| ÌýÌý Inputs to educational & vocational structures | 24.1% | 20.1% | 11.5% | 3.1% | -0.5% | ||||
| Construction materials (PPI ‘Special Index’) | 31.9% | 31.1% | 19.3% | 4.1% | 0.1% |
The ‘service’, ‘commodity’ and ‘energy’ indices (in the middle section of the table) are based on ‘factory-gate’ sales prices.
The ‘input’ indices (at bottom) reflect costs faced by contractors. They exclude capital investment (i.e., machinery & equipment), labor & imports.
The ‘input’ indices are built up from the ‘service’ (design, legal, transport & warehousing, etc.) ‘commodity’ and ‘energy’ indices.
Table: ConstructConnect.

Chart: ConstructConnect.
Alex Carrick is Chief Economist for ConstructConnect. He has delivered presentations throughout North America on the U.S., Canadian and world Âé¶¹´«Ã½Ó³» outlooks. Mr. Carrick has been with the company since 1985. Links to his numerous articles are featured on Twitter , which has 50,000 followers.
Please click on the following link to download the PDF version of this article:
Recent Comments